Loadbank and Cable Hire


It is a fact that the majority of Standby Power Systems are run on light or no loads, normally during planned operational system testing.

If untested, carbon deposits will build up within the generator and have a detrimental effect on its reliability, performance and efficiency.

If you have a single generator or a multi generator Standby Power System we have the skills and the equipment to support you.

Gentec Services Ltd have a fleet of loadbanks from 10Kw to 1Mw Loadbanks.

All our Loadbanks are mobile and are capable of providing Data Capture giving you a report of the generators performance.

All of our Loadbanks can be provided with suitable cable of any length required.

Gentec Services Ltd Loadbanks and able are the most competitively priced across Southern England.

Please Call us on 023 9200 7868 for more information.

Devon, Somerset, Dorset, Wiltshire, Berkshire, Hampshire, Surrey, West Sussex, East Sussex, Kent.
 




© Copyright 2020 Gentec Services LtdWeb Design by Toolkit Websites